RESIDENTIAL COMPLEX
GULLIVER

City centre

6 multi-storey residential buildings

Underground two-level garage car park

Own infrastructure

ABOUT THE PROJECT

Gulliver" residential complex is a unique space for comfortable living, located in the heart of the city. The site is bounded by Pritytskyi Street from the north, Dunina - Marcinkevicha Street from the south, the territory of the ice palace from the west, the territory of the covered market "Rakovsky Kirmash" and the cinema "Aurora" from the east.

Convenient location near the metro provides easy access to any point of the city, as well as proximity to cultural, entertainment and shopping centres.

The project provides for the construction of 6 apartment blocks united by a single style and philosophy. The facades of the houses are made of modern materials, which gives the complex a stylish look.

Residents are provided with underground parking to ensure safe and convenient storage of vehicles. Lifts and entrances are made with accessibility for less mobile citizens in mind.

High-tech architecture, convenient infrastructure, underground parking, security and proximity to entertainment. A perfect combination of comfort and modernity.

INFRASTRUCTURE

"Gulliver" offer extensive internal infrastructure. On the territory of the complex there are children's and sports grounds, recreation grounds, well-maintained park areas.

To take care of the health of the residents, the territory free of buildings is provided with lawns, trees and shrubs, installation of small architectural forms and lighting.

A convenient pedestrian connection from residential buildings to the public transport stop on Pritytskogo Street with stairs and a ramp is provided.

HOUSE CHARACTERISTICS

House construction technology

For houses No.1, No.2 on the basis of monolithic frame.

Exterior walls of the above-ground part of the building are designed from aerated concrete blocks, expanded clay concrete blocks, monolithic with continuous insulation with mineral wool boards.

Facade finish

Exterior finishing of facades of houses No. 1, No. 2, from 1-4 floors and entrance groups of houses No. 1 and No. 2 is assumed in the form of porcelain stoneware vent facade. Finishing from 5-13 floors decorative plaster with imitation brickwork or in the form of flexible bricks on a grid. From 14-19 floors - ventfasade. Also on the facade are applied decorative elements made of aluminocomposite or steel.
The finishing of the courtyard facades is in the form of decorative plaster.

Composition of houses

Residential buildings No.1, No.2 are designed as 5-sectional, 19-storey (18 residential floors), with a technical underground floor, technical attic, flat roll roof with internal drainage.

On the 1st floor are designed: built-in public premises with separate external entrances, premises of entrance groups in the residential building sections.
On the typical floor 2 and 3 room flats, extra-apartmental premises are designed. The technical underground floor is intended for technical premises (ITP, electric switchboards) and laying of communications.

Entrances to the residential part of the building are provided from two sides of the building: one - from the side of Pritytskogo street, the second - from the side of the courtyard and underground garage.

COMPOSITION OF FLATS

Flats in residential buildings consist of: living rooms, hallways, bathrooms, summer rooms.
In some flats kitchens are united with living rooms in a common space, some flats are designed with kitchen equipment in one of the living rooms.

Ceiling heights

The height of a typical floor (between floors) is 3.0 m.

The height inside a residential space from floor to ceiling is 2.7-2.8 m.

UNDERGROUND CAR PARK

The car park is designed for 313 cars with a total area of 11,600 m2 with cars placed on 2 levels. The car park includes bicycle storage and cleaning equipment rooms.

CONSTRUCTION PROGRESS

The construction of the Gulliver residential complex is progressing in strict accordance with the approved schedule. At the moment the works on levelling and preparation of the construction site have been completed. All stages of construction are strictly controlled by qualified engineers and architects to ensure high quality and safety of the facility. Successful completion of construction is expected in the coming months.

FLAT PURCHASE TERMS

After the conclusion of the contract for residential/non-residential premises, the calculation of the cost of 1 m2 is made (carried out), construction start/end dates and other terms of contracts with investors are determined (including the amount of down payment), and the project declaration is prepared for placement (publication). Approximately within 30 working days after the conclusion of the contract.

Conclusion of contracts for the creation of shared construction objects in the Republic of Belarus is regulated by the norms of the Decree of the President of the Republic of Belarus dated 10.12.2018 No. 473 "On Shared Construction" (hereinafter - the Decree), in accordance with the norms of which the enterprise will place (publish) the project declaration in the newspaper "Minsk Courier". The project declaration shall contain information on construction objects for which applications are accepted for the conclusion of a contract for the creation of a shared construction object in accordance with the norms (requirements) of the Decree.

After placement (publication) of the project declaration, information on the object is placed on the website of the enterprise (www.uks.minsk.gov.by), including layouts of residential/non-residential premises specified in the project declaration, for familiarisation of potential investors (shareholders) with them.

The project declaration - download the document

Amendment with addendum to the project declaration - download the document

According to the first paragraph of subparagraph 1.6 of paragraph 1 of Decree:
1.6. the developer is obliged to publish a project declaration with information about itself, the construction object, and the procedure for accepting and registering applications for the conclusion of contracts in at least one state printed publication no later than seven calendar days before the start of contracting.

Taking into account the above mentioned, acceptance and registration of applications shall be carried out from the date specified in the project declaration until the moment of collecting the required number of applications corresponding to the number of declared objects in the order of a live queue not earlier than 7 days after the publication (placement) of the project declaration in at least one state printed publication.

Admission procedure: one application for one residential/non-residential premises from an individual (legal entity), individual entrepreneur, including in the case of submission of an application by power of attorney in the order of the live queue.

Accepting applications at:

г. Minsk, Sovetskaya str. 17.
Entrance from the courtyard area.

Mode of operation:

Mon - Fri: 8.45 - 18.00,
Fri: 8.45 - 16.45,
break: 13.00 - 14.00.

Phone

+375 (44) 571-50-00 A1
+375 (33) 398-20-00 MTS

Developed by RPT

Cookie-файлы
Настройка cookie-файлов
Детальная информация о целях обработки данных и поставщиках, которые мы используем на наших сайтах
Аналитические Cookie-файлы Отключить все
Технические Cookie-файлы
Другие Cookie-файлы
Нажимая на кнопку, я принимаю условия соглашения. Подробнее о нашей политике в отношении Cookie.
Принять все Отказаться от всех Настроить
Cookies